Post

Cities: Skylines 2 - Power Bottleneck Troubleshooting Guide Explains how to solve power bottleneck issues in Cities: Skylines 2, substation placement strategies, and how to check energy consumption. Suggests placing substations near major buildings and roads with four or more lanes, and efficiently managing the power grid using underground cables.
Cities: Skylines 2 - Power Bottleneck Troubleshooting Guide
1. ⚡ Cities: Skylines 2 Power Problem Diagnosis and Solution Approach
  • ✅ Power bottlenecks occur due to insufficient transmission capacity in the power grid.
  • ✅ Focus on solving existing power grid issues instead of building new power plants.
  • ✅ Identify key points where electricity enters the grid from the outside (e.g., substations).

Problem TypeDescription
BottleneckPower supply to specific areas is not smooth due to insufficient power transmission capacity
Substation OverloadPower demand is concentrated on a specific substation, exceeding its processing capacity
00:00 - 01:25
1. ⚡ Cities: Skylines 2 Power Problem Diagnosis and Solution Approach
  • ✅ Power bottlenecks occur due to insufficient transmission capacity in the power grid.
  • ✅ Focus on solving existing power grid issues instead of building new power plants.
  • ✅ Identify key points where electricity enters the grid from the outside (e.g., substations).

Problem TypeDescription
BottleneckPower supply to specific areas is not smooth due to insufficient power transmission capacity
Substation OverloadPower demand is concentrated on a specific substation, exceeding its processing capacity
01:26 - 03:58
2. 🔄 Substation Relocation Strategy and Power Grid Connection Improvement
  • ✅ Substations should be connected to major roads to increase power transmission efficiency.
  • ✅ Relocating substations can improve power flow and alleviate bottlenecks.
  • ⚠️ Consider the impact on surrounding areas when relocating substations (e.g., demolishing residential areas).

ConsiderationsDetails
Road TypePlace substations on major roads with 4 or more lanes to secure power transmission capacity
SurroundingsMinimize demolition of residential areas, consider harmony with upgraded buildings
03:59 - 05:55
3. 🛣️ Improving Power Supply by Utilizing Major Roads and Installing Underground Cables
  • ✅ Expand the city's power grid to increase the number of power receiving points.
  • ✅ Improve power grid connections by installing substations on major roads such as 4-lane roads.
  • ✅ Use underground cables to expand the power grid without the limitations of above-ground space.

StrategyDescription
Major Road PlacementMaximize power transmission efficiency by placing substations on roads with 4 or more lanes
Underground Cable UtilizationSecure key power grid connection points without above-ground space limitations
05:56 - 07:21
4. 🏢 Analyzing Energy Consumption and Placing Substations Near Major Facilities
  • ✅ It is best to install substations on 4-lane or 6-lane roads.
  • ✅ Place substations near areas with high energy consumption (industrial areas).
  • ✅ Major facilities such as cargo ports, postal sorting facilities, technical colleges, and airports consume a lot of power.

Facility TypeDescription
Cargo Port/Postal Sorting FacilityLogistics and transportation-related facilities require high power consumption
Technical College/AirportSpecial buildings consume more power than general buildings
07:22 - 09:33
5. 📊 Checking Power Consumption Information and Summary of Problem Solving
  • ✅ Check the city's power consumption through the information view.
  • ✅ Install additional substations near areas with high energy consumption.
  • ✅ Place substations on 4-lane or 6-lane roads, and use underground cables if necessary.

SolutionDescription
Substation PlacementInstall substations in areas with high energy consumption and near major roads
Underground CablesExpand power grid connections without above-ground space limitations
Emergency Battery StationEmergency power supply in case of power supply problems (optional)
CitiesSkylines2전력문제병목현상해결도시계획전력망관리