Post
MineMogul #2: Get rich quick with automated mining and selling!
This time on MineMogul, we aim for full automation from ore mining to processing and sales, pursuing efficient ways to earn money. We'll be taking on the challenge of securing new drill installation locations, introducing ore analyzers, and building an iron plate production line.
1. 💰 Using Funds to Find New Drill Installation Locations
- ✅ Currently holding over $14,000.
- ✅ Searching for new locations where drills can be installed to expand mining capabilities.
- ✅ Confirming that there is still space to install multiple drills in this area.
00:05 - 00:43
1. 💰 Using Funds to Find New Drill Installation Locations
- ✅ Currently holding over $14,000.
- ✅ Searching for new locations where drills can be installed to expand mining capabilities.
- ✅ Confirming that there is still space to install multiple drills in this area.
00:44 - 01:59
2. ⛏️ Purchasing New Equipment: Ore Analyzer and Rolling Mill
- ✅ Purchasing an ore analyzer and a rolling mill as new equipment.
- ✅ The ore analyzer displays the type, weight, and unit price of the ore on the conveyor.
- ✅ The rolling mill processes ingots into plates.
- ✅ Purchasing six drills and moving them to the installation location.
02:11 - 02:41
3. ⚙️ Rolling Mill Installation and Iron Plate Production Quest
- ✅ Installing the rolling mill and starting the process of turning ingots into plates.
- ✅ The quest requires the delivery of 20 iron plates.
- ✅ Considering reorganizing the production line as other plates may be needed in the future.
03:05 - 03:25
4. 💎 Ore Analyzer Functionality and Placement
- ✅ Installing the ore analyzer and checking the ore information on the conveyor.
- ✅ Analyzing the type of ore, ratio, and value of the ingots.
03:52 - 05:25
5. ⛏️ Drill Installation and Mining Area Analysis
- ✅ Removing the surrounding ore to secure space before installing the drills.
- ✅ Checking the type and ratio of ore in each drill's mining area.
- ✅ Understanding the types of resources that can be mined, such as coal, iron, and copper.
- ✅ Installing an additional six drills and starting mining.
06:16 - 06:57
6. 🧪 Using Research Tickets: Shaker Table with Water Jet
- ✅ Spending research tickets to unlock the shaker table with water jet.
- ✅ This machine has the potential to generate rubies from coal.
07:04 - 07:43
7. 🔄 Conveyor Reconstruction and Establishment of Sales Route
- ✅ Building a conveyor to transport ore mined from all drills to the final sales location.
- ✅ Establishing a route for processing and selling iron and copper plates.
07:44 - 11:26
8. 🏭 Explanation of Automated Ore Processing System
- ✅ Mined ore is collected in one place, and coal, ingots, and gems are separated by a sorter.
- ✅ The ore is crushed into smaller pieces by a crusher and then separated again into iron, copper, and gold by a sorter.
- ✅ The sorted ore is processed in a smelter, polished with a polishing machine, processed into plates, and then sold.
- ✅ Coal is dissolved in water, potentially generating rubies.
- ✅ Rubies and other gems are polished with a polishing machine and sold.
